700kW Resistive/Inductive load bank test unit

resistive load 700kW
inductor
800kW Load Bank
Resistive-loadbank-1500-2000kw-5
resistive load 700kW
inductor
2018 800kW Load Bank yellow-3
Resistive-loadbank-1500-2000kw-5
previous arrowprevious arrow
next arrownext arrow
Model: KPLB-700
Testing capacity: 0 – 700 kw
Type of load: Resistive, PF = 1.0
Duty: Continuous
Cooling system: Industrial grade axial fan
Phase: Available at both single and three phase
Rated testing voltage: 110-480 VAC
Rated Frequency: 50/60 Hz
Dimensions (L*W*H)(mm): 2400x2030x2100
Weight: 2020 Kg

Models You Can Choose

Model Testing 

capacity

Type 

of 

load

Cooling 

system

Phase Rated 

Testing 

Voltage

Rated  

Frequency

Dimensions   (L*W*H)

 (mm)

Weight

 (kg)

KPLB-100 0-100

Resistive

or

Reactive,

PF =

1.0 or 0.8

Industrial

grade

axial fan

Available

at both

single

and

three

phase

110-480

VAC

50/60 Hz 960*1060*1400 350
KPLB-200 0-200 1560*1310*1650 500
KPLB-300 0-300 1690*1440*1750 1083
KPLB-400 0-400 1900*1600*1900 1200
KPLB-500 0-500 1900*1600*1900 1400
KPLB-600 0-600 2100*1750*2000 1550
KPLB-700 0-700 2100*1730*2000 1650
KPLB-800 0-800 2400*2030*2100 2020
KPLB-900 0-900 2400*2030*2200 2050
KPLB-1000 0-1000 2400*2030*2200 2010
KPLB-2000 0-2000 20 ft container 6000
KPLB-5000 0-5000 40HC container 16000
KEYPOWER generator tester specifications
Measurement Range Accuracy Resolution Overload
Voltage (V) 10.0~500.0V ± (0.4% reading+0.1%range) 0.1V 600V
Current (A) 0.030~5.000A ± (0.4% reading+0.1%range) 0.001A 6A
power According to volt range & current range Power factor=1.0 <200W 0.1W
± (0.4% reading+0.1% range) ≥200W 1W
Power factor=0.5 ≥2kW 10W
± (0.8% reading+0.2% range)
Power factor 0.20~1.00 ±0.02 0.001
Frequency 45~65Hz ±0.2Hz 0.01Hz
Running time 99h59m ±2min/hour 1 minute
Energy
(kWh)
99999kWh  Power factor=1.0 0.001kwh
± (0.4% reading+0.1% range)
Power factor=0.5
± (0.8% reading+0.2% range)
Harmonic analysis (%) 2-50 times and total harmonic

Load bank is a simulating load test equipment used for generators, UPS, battery banks etc power systems testing.

(1) Routine load test prolongs the service life of standby generators by minimizing their chances of suffering from wet stacking, cylinder glazing, fouling of exhaust ports and excessive oiling.

(2) Used for standby generators routine maintenance or functional test to avoid cutting off the mains supply for the whole power system.

(3) Using load bank for standby generators maintenance or functional test effectively reduces the risk of the powered devices being damaged by the potentially malfunctioning generator.

IMPORTANT NOTES:

  • When the load bank is running, no one is allowed to walk through nor flammable materials such as gasoline, diesel should be placed within 10m extent of the exhaust end.
  • When the load bank is running, people with long hair are not allowed to walk through within 1m extent of the air intake end.
  • The airflow direction of the load bank is from air intake end to exhaust end. When the fans start running, make sure the airflow direction is correct, otherwise, you’ll need to adjust the phase sequence of the input mains power or the testing power.